Buildings
The full siloFields
A harvest bigger than the free room of the silo is not lost: the silo is filled, and the surplus is sold at once to the nearest co-op, within 20 km, at today’s price less 10%.
Before you start or order a harvest, Fields always writes the harvest expected and the free room in the silo, counting the harvests already ordered or under way that are not in yet. When the harvest will not fit, a warning tells you how many tonnes will be sold this way. You can confirm all the same.
Selling yourself from the Market therefore brings in more: make room in the silo, or extend it, before a big harvest. Without a co-op within reach, nothing is sold: the harvest with your machinery is refused, or waits for room in the silo if it filled up in the meantime, and the one of the contractor is cancelled and refunded.
Passive wear and the machinery shedMy equipment
Even when it stands still, the equipment you own loses condition each game month. A machinery shed limits this loss.
| Storage | Wear per game month |
|---|---|
| Outside | 0.5 % |
| Under cover | 0.1 % |
Your machinery sheds hold as many machines as their capacity, the most expensive first. The others stay outside.
A machine working or under repair when the month turns is not affected: it loses nothing that month.
The sheets of the fleet are sorted by place, in this order: “Under cover”, “Outside”, then “Working or under repair”. The title of each group says what a month standing still costs there. The game sorts them again as soon as a machine goes to work or comes back.
Storage in the siloMarket
Grain stored in the silo is not lost and its storage costs nothing: you can wait for a dearer month to sell. Straw has its own storage, outside the silo: see “Straw”.
Extending a buildingMarket
In Buildings, a building whose capacity you choose, such as the grain silo, the fuel tank or the machinery shed, including those received at the start, can be extended up to the maximum capacity of its type, by the action that names this building. “Extend the farm”, next to the gauge, buys building land: it is not the same action.
The extension costs the difference between the price of the extended building and that of the current one, marked up by 10% for the works: extending step by step costs a little more than building big straight away. The area taken grows by the difference of area, and the extension is refused when the building land left or the cash does not cover it. It is immediate, and the new capacity counts everywhere as soon as it is paid.
Before you confirm, you see next to it the price and the area of a second building of the capacity added, or of the smallest one that covers it when it cannot be built on its own: it is up to you to choose between one large building and the cheaper option. A demolished building refunds half of everything paid for it, building and extensions. The workshop, the wash bay and the house cannot be extended: they are demolished then rebuilt at the level wanted.